Proactive plan

I have been working on a plan to create two smaller manageable lakes which would entail the Riverside County side to be fed by the Whitewater and Imperial County side to be fed by the New and Alamo Rivers. 
A desalination facility powered using geothermal energy could be built/funded to mitigate the high salinity.
100 years of the Colorado river spilling water into Lake Cahuilla creating the Salton Sea, created a water table that could be pumped and added to the Sea to dilute its high levels of salt.
The EPA has a long used expression “the solution to pollution is dilution”

Leave a Reply